My 'OOPS'.
Assumed plastic water pipe. did the 2 rods(builder does not use rebar), then suddenly 650' of 1" copper water pipe shows up!
Meter and panel on the left rear,in the garage, W-main is in the right front.
140' later,it is bonded.
Which leads me to a question:
200A #4 to the grd rods. Do I need #4 to the water main? or is that now a bond and # 6 will do?
(I ran #4 already- Ouch)
Never assume!