It's not economicaly viable at this point in the technology.
I'm not at all surprised that these folks are having an extra-tough time competing on a level playing field.
I've always said that 'subsidies' are a way to entice you to make the wrong decision.
please take a short cruise through this> ( da*ned if i can get the link to work!)http://www.bootsontheroof.com/index.php?option=com_content&view=article&id=32:requirements-for-solar-installation-a-incentives-by-state&catid=14&Itemid=65
this is what i'm competing with btw>Licensing (PV)
•Currently, the State of Vermont does not offer or require a specific license for installing PV. Renewable Energy Vermont and other industry leaders have proposed the creation of a Renewable Energy Specialty (S) license which would be required for the electrical portion of a PV installation which includes the wiring from the panels up to and including the AC interconnectionmore from the IAEI>http://www.iaei.org/magazine/2008/0...s-for-solar-energy-system-installations/[
b]Certification Program[/b]The North American Board of Certified Energy Practitioners (NABCEP) offers an independent certification for PV system installers; however, it is not a governmental license or endorsement to engage in trade practice or contracting.
3 Candidates for this certification qualify based on documented PV systems installation experience and training, must pass a 4-hour 60-question examination, sign a code of ethics, and maintain practice and continuing education for re-certification every three years. A job task analysis for PV installations has been developed by NABCEP, and is the basis for the certification program and examination content.
While intended as a voluntary, value-added credential, NABCEP certification is becoming increasingly important to participate in this industry. For example, Maine and Ohio both require NABCEP certification to become eligible for state rebate funds*, and Utah requires the certification to qualify for their solar contractor license. Numerous specifications are now requiring the bidder to retain or employ a NABCEP-certified individual on the project. However, not all NABCEP certificants are legally licensed and entitled to pull permits and engage in construction contracting. Many are architects, engineers, educators, salespersons, journeypersons or others who may be integrally involved with PV projects, and may work with or for contractors or integrators, but are not contractors themselves.* as is Vermont btwof course i may stand corrected , i.e.- level playing field, when someone points out the 12,000 hours as prerequisite, that WE all did...
~S~