All;

The remaining Plan Set Sheets for the "Larry, Moe and Curley Cold Storage Facility" are available for your review and use.

These remaining Sheets are spanned across (4) separate Reply Messages in this Thread (Replies following this Message).

These Plan Sheets will also be used with the existing Discussion Thread:

Design and Installation Discussions

At the Electrical Theory and Applications area.

Sheet List -

Sheet: "E-1.0" Electrical Set Cover Page.
Found On: Post #5


Sheet: "E-1.1" Building Footprint and Scope of Work Area.
Found On: Post #5


Sheet: "E-1.2" Interior Lighting Compliance Forms, Lighting Control Schematics Page.
Found On: Post #6


Sheet: "E-2.0" Single Line Diagram(s) Page.
Found On: Post #7


Sheet: "E-2.1" Panelboard Schedules Page.
Found On: Post #7


Sheet: "E-3.0" Electrical Power Plan.
Found On: Post #1 (previously uploaded and attached)


Sheet: "E-4.0" Interior Lighting Plan.
Found On: Post #8

Sheet: "E-4.1" Interior Lighting Layout (Dimensions) Plan.
Found On: Post #8

Sheet: "E-5.0" Refrigeration Controls Plan.
Found On: Post #1 (previously uploaded and attached)

Sheet: "E-6.0" Electrical Detail Drawings.
Found On: Post #2 (previously uploaded and attached).

If there are any questions, comments, suggestions, or if there is something that needs clarification, feel free to post a message in one of the running Discussion Threads:

Design and Installation Discussions Thread

Walk In Cooler Thread

or one of the following options:

  • Create a new Discussion Thread (Post a Message) in the Electrical Theory and Discussions Area,
  • Create a new Discussion Thread (Post a Message) in the General Discussion Area,
  • Contact me via Private Message ("PM"),
  • Send me an E-mail Message.


Have fun everyone!!!

-- Scott

Remaining Plan Sheets to follow this Message.

06-10-2011 16:59:00 S.E.T.


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!