I presume that you're trying to isolate the expense of powering up the basement.

That is, you're looking to rent the space.

Your lowest cost gambit is to correct the ground/neutral path as described above.

Then shift the loads unique to the basement over to sub-metering like E-Mon D-Mon.

http://www.emon.com/index.html



Tesla