Quote
For some time, quite a few guys still installed rods with Ufers, and I still find the occasional 'water ground' with a jumper on the 2" plastic main, and PEX piped resi.


They don't peel back the outer layer of Pex-Al-Pex pipe to bond to the Al layer? Those lazy clowns! grin

Larry C

Last edited by Trumpy; 09/30/10 11:26 PM. Reason: Edited bad language out