I suppose the real answer is in what the calculated turnover is with the existing pump. I believe the design spec is every 6 hours. If that is the case you could run it 12 hours at normal speed (2 turnovers), and then run it half speed for 12 hours to get the 3d turn over. I am still not sure why they say 3 speeds.

Thanks


Greg Fretwell