If possible, try to get the utility to run as much of the distribution as you can get with medium voltage. Drop transformers and feed the sites from the center. It always amazes me how much load diversity they assume. I believe the last one I did had a 25KVA (may have been 37) for six 50a sites. If they are back to back sites, the service conductors are pretty short.