Originally Posted by BigB
I've been doing a lot of remodels lately and I always get stuck with moving the phone lines and putting them back together after the demo crew cuts thru them.


the best tool I have found for dealing with this problem is my change order book. Demo crews get so brave with phone and tv lines, they sometimes think its nothing for you to repair all the random cuts in the phone lines they make for no real good reason. If only those lines would ark shower, then that might slow down the mahem a bit. Otherwise I hit the general contractor in the pocketbook and sooner or later he has a talk with his crew of monkeys.