The meter combo IS the main service panel.
The panel on the inside will be a 'sub' panel; assuming it is fed from a breaker in the outside panel.
And don't forget to pull a ground too. wink

I'd still use another main panel inside though.


Design-Build isn't supposed to mean design *as* you build.