The meter combo IS the main service panel. The panel on the inside will be a 'sub' panel; assuming it is fed from a breaker in the outside panel. And don't forget to pull a ground too.
I'd still use another main panel inside though.
Design-Build isn't supposed to mean design *as* you build.