I'd guess the red and black go to the permanent panel inside the house; when the temp is no longer needed, this panel will be removed and the red and black lines will be pulled into the meter can. They are taped up so they won't accidentally touch anything.
The lack of bushings around the red and black is to give the next guy a head start on stripping the insulation.