-The cable is run in 3/4" rigid (galvanized) conduit, under concrete among other things, approximately 45' from the main building, so you can see why I'd want to try and get by without that additional conductor.-
Is the rigid run from panel to panel? If so good.
Or are you pulling an AC feeder thru it as a chase