If they worked on it before deengerigzed why was it energized this time? POCO not notified or did something go wrong? I would think that the POCO would shunt everything to ground before work began while working on such high voltage. Did something get overlooked. Everytime i hear of these things i shiver. Tagout procedures and lockout to be followed and double checked. My heart goes out to the familys of the people that were hurt.