They're going to have to either re-route that plastic pipe, or install a main disconnect on the outside of the house. If the panel gets moved any further to the right, IMO that would be a violation of the "nearest point of entrance" rule. Clean up the rest of the old BX cables.... $5600!!!

By the way, mad props to the installer for taping up that grounded conductor. At least he was trying to make a safe install. LOL