How about snaking some new wires into the pole base along with the existing light feed.
Or as John has said pipe up the side of the base, if I had to do that it would certainly be done with schedule 80 RMC and a lot of high quality supports.
[This message has been edited by iwire (edited 06-06-2004).]
Bob Badger Construction & Maintenance Electrician Massachusetts