My first thought was that the plumbing looks awful. I don't know much about the code for it but it wouldn't pass my inspection as a prospective homwowner. It took a second look to notice the 10 foot loop of romex powering the sucker. One of the things that really bothers me is its all stuff that could have EASILY been done much better. What do you think, another 1/2 hour on the whole job to have it the way it should be?