JPS:

OK, perhaps I have to clear the fog.....

3-ways are NOT required by the NEC, as Bob said, leading to the SP at each 'level', and multiple lampholders/luminaires.

Design wise, and common sense, and basically what a 'good ec does is install 3-ways, 4-ways, etc.

John


John