JPS:
OK, perhaps I have to clear the fog.....
3-ways are NOT required by the NEC, as Bob said, leading to the SP at each 'level', and multiple lampholders/luminaires.
Design wise, and common sense, and basically what a 'good ec does is install 3-ways, 4-ways, etc.
John