The present installation is an extension cord run across the top of the grid to a wall, where it is poked thru to a wall duplex. The fire inspector said they have to change it, and said it would be ok set up the way I described it in my original post. Now I will have to tell them no matter what the fire inspector says, I can only do it to code. Thanks for the help everyone.