Thanks , I was looking for an out for a problem I have. We installed some plastic fs boxes in a concrete pour. Not realizing that they were putting marble on these walls . Now my fs boxes are about 1 1/2 inches back of the finshed stone. Tried using a handy box collar but it doesnt cover the whole box. About 1/8 inch gap on each side. any ideas ?