ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Tinfoil-hat crowd is getting stupider...
by grich - 06/02/20 06:43 PM
2020 GFCI changes
by gfretwell - 06/02/20 12:01 PM
Pool Lights?
by gfretwell - 06/02/20 11:53 AM
Norwegian power?
by WaterIngress - 05/27/20 11:43 AM
Tips on how to read 2018 CE Code Book?
by Rob2019 - 05/23/20 10:02 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 14 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Gallery
Next Gallery
Print Thread
Rate Thread
Page 1 of 2 1 2
Copper Theft #213689 06/27/14 09:41 AM
002.JPG
Joined: Apr 2002
Posts: 7,178
HotLine1 Offline OP
Member
Copper Theft

Another brave thief....
Tools for Electricians:
14 Comments
Re: Copper Theft [Re: HotLine1] #213690 06/27/14 09:43 AM
Joined: Apr 2002
Posts: 7,178
HotLine1 Offline OP
Member
Cut the fence, cut the secondaries, pots were still energized.

Sorry to say there were no dead bodies!!


John
Re: Copper Theft [Re: HotLine1] #213693 06/27/14 11:35 AM
Joined: Feb 2004
Posts: 1,432
Lostazhell Offline
Member
That whole setup looks funky to me with all the plant growth on the primary insulators. Is this place abandoned?

Re: Copper Theft [Re: HotLine1] #213694 06/27/14 09:03 PM
Joined: Apr 2002
Posts: 7,178
HotLine1 Offline OP
Member
Lostashell:

This type setup here is referred to as a 'mat job'. Yes, it is 'old' technology, and is slowly going away. Three or six pots was standard before pad mount units. 250, 333, 500 KVA were common, occasionally 750s.

Today, when there is a failure in an existing mat, the failed pot will be replaced, or the full set may be replaced.

AS to the building in the pic, yes it is vacant, as the avionics co that was there outgrew to 65k SF.

As to the vegatation, sorry to say it is 'common' with mat jobs. The transformers, primary pole and wiring are POCO owned and maintained. The fence is locked with a POCO lock. The POCO does provide forestry work, but most of the time it is done after a failure, blown cut-out, etc.

Guess this is not something you see on the west coast??


John
Re: Copper Theft [Re: HotLine1] #213699 06/28/14 11:47 AM
Joined: Jul 2004
Posts: 9,485
G
gfretwell Offline
Member
The transformer farms are fairly well maintained here, at least the fence and the weeds. They spray enough herbicides around to be sure nothing is growing. We have weeds here that could completely cover a transformer like that in a month.


Greg Fretwell
Re: Copper Theft [Re: HotLine1] #213701 06/28/14 01:01 PM
Joined: Apr 2002
Posts: 7,178
HotLine1 Offline OP
Member
The 'usual' POCO weed patrol is a troubleshooter with a manual lopper. "Herbicides"?? I think that item is not on their list. May be a DEP/EPA thing, or that a license is required.

The good part is that the mat jobs are slowly disapering.



John
Re: Copper Theft [Re: HotLine1] #213706 06/29/14 01:19 AM
Joined: Jul 2004
Posts: 9,485
G
gfretwell Offline
Member
They sell full strength Garlon 4 at the rural king here (just pay) and it is trivial for the PoCo to buy at a distributor.


Greg Fretwell
Re: Copper Theft [Re: HotLine1] #213707 06/29/14 03:43 AM
Joined: Sep 2002
Posts: 889
N
NORCAL Offline
Member
Seen a soil sterilizer that was used, nothing but bare earth,without it there would have been Star Thistle & other noxious weeds. Suspect that it would have to be applied by a licensed applicator though.

Re: Copper Theft [Re: HotLine1] #213710 06/29/14 06:42 PM
Joined: Oct 2010
Posts: 17
LEO_304E Offline
Member
Originally Posted by HotLine1
Cut the fence, cut the secondaries, pots were still energized.

Sorry to say there were no dead bodies!!


Wow!

Re: Copper Theft [Re: HotLine1] #213711 06/29/14 09:55 PM
Joined: Jun 2004
Posts: 1,273
T
Tesla Offline
Member
The generally abandoned nature of the site makes one think that the primaries were de-energized.

Out my way the AHJ have prohibited this type of service whenever and wherever possible.

Instead, primary distribution occurs underground with pad mounted transformers -- feeding bus-duct taps (see photo above) by proximate placement as necessary. (Bus-duct taps establish fire isolation, FYI)

This style also takes weather out of the equation and saves on real estate.

Hereabouts the cost of trenching is very high. The ice age glaciers scraped off all of the topsoil, leaving rock and some dusting on top. None-the-less, underground distribution is mandated.

The Pocos have discovered that underground distribution largely eliminates weather crisis. Crisis labor rates are out of this world. (plus bad politics)



Tesla
Page 1 of 2 1 2

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 