ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 117 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 4 of 5 1 2 3 4 5
Joined: Nov 2006
Posts: 348
I
ITO Offline
Member
Been doing this for many years and have never touched a PLC, and out of a workforce of 60 I maybe have one or two guys who has.


101° Rx = + /_\
Joined: Oct 2003
Posts: 172
G
Member
Some people know everything ..but in reality can do nothing.Are u really in a postion to hire....I find that hard to beleive.

Joined: Nov 2006
Posts: 348
I
ITO Offline
Member
...

Last edited by ITO; 04/03/07 03:40 PM.

101° Rx = + /_\
Joined: Nov 2006
Posts: 348
I
ITO Offline
Member
You might also find it hard to believe but I don’t do:
Fire Alarm
Security
Controls (including PLCs)
BAS (other than pulling the wire for NOVAR)
Data (other than pulling the wire)
Telephone (other than pulling the wire)
Lightning Protection
Painting
Patching
Telephone backboards
Sound Systems
Or any work more than 25 miles from my shop

Only if I have to and there is no way to scope it out of my work, I will do fire caulking.


101° Rx = + /_\
Joined: Nov 2005
Posts: 507
M
Member
wow...didn't see that one coming

Joined: Nov 2005
Posts: 507
M
Member
Here is a simple one Shock...know how to wire ballasts...fluorescents and HIDs. And know how to wire them efficiently. It shouldn't take 4 hrs to wire 3 ballasts 8' off the ground.

We are also in NJ, and do a bunch of commercial/retail maintenance.

#1 attribute - know how to read and know how to think. Be able to figure out what's there, understand it, and then understand how it works. Be able to read schematics, you can fix anything, if you can understand the schematics.

I've been in this business going on 15 yrs now. We've done warehouses, factories, offices, retail stores, pharmacy's, etc...know how to read and how to think your way out of a paper bag, and you got it knocked.

PLC's - they almost all come with manuals. Might take a little longer, but the directions are there. And on the commercial side, you won't see to many of them.

Joined: Nov 2006
Posts: 348
I
ITO Offline
Member
There is a difference between PLC/control work and hooking up a simple ice cube relay.

The big problem I run into is that there are some great non-union shops here in town that do control, data/phone, security, and fire alarm for about half (sometimes a 1/3) my labor rate.

Last edited by ITO; 04/03/07 05:42 PM.

101° Rx = + /_\
Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
Some of the dispute here is caused by confusion as to the trade being discussed.

If you are a journeyman electrician, working for an electrical contractor who focuses on commercial / industrial work, you may never see a PLC.

If you are a maintenance electrician, working for a manufacturer, you'll deal with PLC's on a daily basis.

Once again ... to get the right answer, you have to ask the right question.

Joined: Jul 2004
Posts: 9,931
Likes: 34
G
Member
I agree Reno. My response was about the construction guys I saw when I was inspecting.


Greg Fretwell
Joined: Aug 2001
Posts: 545
A
Member
I worked with an older ladder logic PLC (Graysoft software)that controlled machines about 10 years ago. But will probably never see one again. Probably not necessary to know it as a commercial/industrial elec.


The Golden Rule - "The man with the gold makes the rule"