Would the same "flexibility theory" apply to all surface wiring within reach of a forklift? There is often conduit run all over machinery, and I've seen plenty of fork holes through walls.

Do you disagree that a drop to a permanent installation does not meet Code?

[This message has been edited by electure (edited 09-25-2006).]