Utilities in this area always maintain the ABC phase rotation on the service. The high leg is B pahse in the rotation and landed on the C phase position in the meter.
Also the code in 408.3(E) and 430.97(B)require that the phase rotation be ABC top to bottom or left to right.
Don(resqcapt19)


Don(resqcapt19)