I remember a few things from the RUUD methods, transformer location preferred in the 'middle' of the layout, 3 wire system, and HEAVY gauge cable.

They also had (have?) a really great application engineering dept. that provided a lot of layout help to me for sports and site lighting design/build jobs.

Soon as the weather breaks here, I have to redo my dock lighting.



John