Looks good from here. You should have saved some phasing tape for the next service [Linked Image] Just kidding.THWN Is good for SE here in south TX.. If you do get failed it may be for the GEC not being protected from physical damage (lawn mowing, etc) also shouldn't the meter can be bonded or somehow continuous to the panel ?? I would like to know. The meter cans we get here have a terminal for the bare #6
Looks like the old service should have been failed, for the 3' rule from windows,openings. The old service looks like its right on the window sill [Linked Image]

[This message has been edited by Sean WB (edited 09-19-2002).]


I did not get as think so badly as you shocked I did.