#52124 - 05/19/05 07:19 PM Underground Service
GovtVoltage Offline
Member
Registered: 04/24/03
Posts: 20
Loc: Sudbury,MA
Is there a requirement of a base for the PVC conduit to lay on in a underground service????> This base being sand or such?
Top
Work Gear for Electricians and the Trades
#52125 - 05/19/05 10:19 PM Re: Underground Service
e57 Offline
Member
Registered: 05/27/03
Posts: 2876
Loc: S.F.,CA USA
Not nessarily a code thing, but may be required by your POCO spec's.
_________________________
Mark Heller
"Well - I oughta....." -Jackie Gleason
Top
#52126 - 05/19/05 10:20 PM Re: Underground Service
mhulbert Offline
Member
Registered: 10/19/04
Posts: 132
Loc: Anaheim, CA USA
300.5 (F) requires "granular or selected material" (ie sand) if the fill contains rocks, paving chunks, etc.

On top of all that, many utilities require sand around the conduit. I know that PG&E here in CA requires 4" of fill that has all rocks under 1/2" dia. Their crews use sand for any work that they do.
Top
#52127 - 05/20/05 04:56 AM Re: Underground Service
dmattox Offline
Member
Registered: 10/20/04
Posts: 265
Loc: Anaheim, CA
Socal Edison requires sand for one conduit. Two conduits are to be partially encased, conduits laying on sand, concrete poured on top of them. 3-4 conduits are to be fully encased, concrete all around them.

I forget when you need to start seperating them, but I know if you have 8 conduits you have to split them into seperate trenches.
Top
#52128 - 05/22/05 10:41 PM Re: Underground Service
Scott35 Offline

Broom Pusher and
Member
Registered: 10/19/00
Posts: 2707
Loc: Anaheim, CA. USA
Ditto on checking with the PoCo!

Also, are you referring to "Cushions" used on Primary Feeder Ducts?

SCE (So. Cal. Edison) wanted Sand and Gravel Cushions on Primary Feeders - especially when Feeders came from Poles on Hills.

SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.

I have the currently used "ESR" Manual from SCE (Electrical Service Requirements Manual), which I use for assistance in designs/engineering projects. If needed, let me know some specifics and I can reply with quotes from the ESR.
Although it may not be exactly what your PoCo would specify, it might be somewhat relavent - just for an idea.

Scott35
_________________________
Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Top
#52129 - 05/22/05 10:52 PM Re: Underground Service
dmattox Offline
Member
Registered: 10/20/04
Posts: 265
Loc: Anaheim, CA
Quote:
SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.


Scott35, in all the work we have done for Edison the secondaries have the same requirements as primaries. This usually means more work on the secondaries on our projects since there are usually multiple conduits which require encasement. While the primary usually is a single conduit requiring just sand.
Top
#52130 - 05/23/05 03:30 PM Re: Underground Service
LK Offline
Member
Registered: 01/21/03
Posts: 1429
Loc: New Jersey
This post made me laugh, a feeder trench for a local auto dealer, was held up for days, because the utility inspector din't like the color of the sand, the engineer on the job was talking to himself.
Top

Member Spotlight
Member Since: 02/23/13
Posts: 204
New in the Gallery:
SE cable question
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box


Who's Online
1 registered (gfretwell), 40 Guests and 10 Spiders online.
Key: Admin, Global Mod, Mod
 
New in the Gallery:
SE cable question
 
Top Posters (30 Days)
Admin 47
HotLine1 43
gfretwell 19
Ruben Rocha 12
Trumpy 9
 
Newest Members
Scotto, Freecrowder, clee512, Jdscott2005, FAIZAN

ECN Electrical Forums - sponsored by Electrical Contractor Network - Electrical and Code Related Discussion for Electrical Contractors, Electricians, Inspectors, Instructors, Engineers and other related Professionals