ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 205 guests, and 28 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#52124 05/19/05 10:19 PM
Joined: Apr 2003
Posts: 20
G
Member
Is there a requirement of a base for the PVC conduit to lay on in a underground service????> This base being sand or such?

#52125 05/20/05 01:19 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Not nessarily a code thing, but may be required by your POCO spec's.


Mark Heller
"Well - I oughta....." -Jackie Gleason
#52126 05/20/05 01:20 AM
Joined: Oct 2004
Posts: 132
M
Member
300.5 (F) requires "granular or selected material" (ie sand) if the fill contains rocks, paving chunks, etc.

On top of all that, many utilities require sand around the conduit. I know that PG&E here in CA requires 4" of fill that has all rocks under 1/2" dia. Their crews use sand for any work that they do.

#52127 05/20/05 07:56 AM
Joined: Oct 2004
Posts: 265
D
Member
Socal Edison requires sand for one conduit. Two conduits are to be partially encased, conduits laying on sand, concrete poured on top of them. 3-4 conduits are to be fully encased, concrete all around them.

I forget when you need to start seperating them, but I know if you have 8 conduits you have to split them into seperate trenches.

#52128 05/23/05 01:41 AM
Joined: Oct 2000
Posts: 2,723
Likes: 1
Broom Pusher and
Member
Ditto on checking with the PoCo!

Also, are you referring to "Cushions" used on Primary Feeder Ducts?

SCE (So. Cal. Edison) wanted Sand and Gravel Cushions on Primary Feeders - especially when Feeders came from Poles on Hills.

SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.

I have the currently used "ESR" Manual from SCE (Electrical Service Requirements Manual), which I use for assistance in designs/engineering projects. If needed, let me know some specifics and I can reply with quotes from the ESR.
Although it may not be exactly what your PoCo would specify, it might be somewhat relavent - just for an idea.

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
#52129 05/23/05 01:52 AM
Joined: Oct 2004
Posts: 265
D
Member
Quote
SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.

Scott35, in all the work we have done for Edison the secondaries have the same requirements as primaries. This usually means more work on the secondaries on our projects since there are usually multiple conduits which require encasement. While the primary usually is a single conduit requiring just sand.

#52130 05/23/05 06:30 PM
Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
This post made me laugh, a feeder trench for a local auto dealer, was held up for days, because the utility inspector din't like the color of the sand, the engineer on the job was talking to himself.