The Electrical Contractor Network

ECN Electrical Forum
Discussion Forums for Electricians, Inspectors and Related Professionals

Books, Tools and Test Equipment for Electrical and Construction Trades

Register Now!

Register Now!

We want your input!


2017 NEC and Related
2017 NEC
Now Available!

Recent Posts
Parking lot pole light swap....
by gfretwell
10/23/16 11:04 PM
International Wire Colour Codes
by Tjia1981
10/23/16 12:08 PM
Son of Sparky
by HotLine1
10/20/16 07:43 PM
Speaking of Plugmold ...
by gfretwell
10/17/16 02:37 PM
Broken battery charger? Check for cobwebs!
by gfretwell
10/17/16 02:30 PM
New in the Gallery:
12.5A through 0.75mm˛ flex (just out of curiosity)
Shout Box

Top Posters (30 Days)
gfretwell 13
HotLine1 7
ghost307 6
renosteinke 6
Potseal 4
Who's Online
1 registered (LongRunner), 230 Guests and 4 Spiders online.
Key: Admin, Global Mod, Mod
Topic Options
Rate This Topic
#30717 - 10/26/03 09:14 AM sizing nuetral for M.C.C.
Tim Peters Offline

Registered: 03/08/03
Posts: 10
I have a MCC feeding a 600 amp 277/480 4 wire MCC. I'm using parallel 500mcm for the phases but there is no actuall load on the neutral so can I get away with no neutral? My concern is that the blue prints list it as 4 wire so do you think they want a neutral pulled for future use maybee?

Any info appreciated.

Work Gear for Electricians and the Trades

Work Gear for Electricians and the Trades
Work Gear for Electricians and the Trades
Arc Flash Clothing, Gloves, KneePads, Tool Belts, Pouches, Tool Carriers, etc. etc....

#30718 - 10/26/03 08:39 PM Re: sizing nuetral for M.C.C.
nesparky Offline

Registered: 06/21/01
Posts: 650
Loc: omaha,ne
Where is this MCC getting it's control power from?
If the plans and specs call out 4 wire, I would install a full size neutral. You cannot know what is planned for the future unless all the MCC buckets are used now.

#30719 - 10/27/03 02:32 AM Re: sizing nuetral for M.C.C.
iwire Offline

Registered: 01/05/03
Posts: 4343
Loc: North Attleboro, MA USA
If the plans called for a four wire feeder to this MCC and you bid it and won it with that requirement you should install it.

Putting aside that it is the right thing to do, if after you leave the job they need that neutral who do you think will pay for it to be installed?
Bob Badger
Construction & Maintenance Electrician

#30720 - 10/27/03 06:13 PM Re: sizing nuetral for M.C.C.
Tim Peters Offline

Registered: 03/08/03
Posts: 10
One bucket of the mcc is feeding a transformer which in turn id feeding a 120/208 panel. This panel is feeding two controll panels for all my controll wiring.
Each bucket of the mcc has a TRF for the coils within it.

I did not bid the job but the nuetral was included in the bid so IMO it should be included but my superiors think different.

This post is mostly meant to justify my thinking, I wanted to make sure I wasnt missing something.

#30721 - 10/27/03 06:19 PM Re: sizing nuetral for M.C.C.
Ryan_J Offline

Registered: 08/19/03
Posts: 1355
Loc: West Jordan, Utah, USA
I would send an RFI to the engineer and get a CCD on paper to cover your back.
Ryan Jackson,
Salt Lake City

#30722 - 10/28/03 03:05 AM Re: sizing nuetral for M.C.C.
zapped208 Offline

Registered: 02/18/03
Posts: 201
Loc: Somewhere in USA
Tim,- Was an equip. gnd. pulled in?, since someone is trying to cut corners on your job?
Shoot first, apologize later.....maybe

#30723 - 10/28/03 01:36 PM Re: sizing nuetral for M.C.C.
Tim Peters Offline

Registered: 03/08/03
Posts: 10
Yes a equipment ground will be pulled in

#30724 - 10/28/03 06:40 PM Re: sizing nuetral for M.C.C.
Pinemarten Offline

Registered: 08/23/03
Posts: 122
Loc: Edmonton, AB, Canada
I feel it is up to the owner.
Now cost vs. later. Explain the cost at a later date.
If he wants to save money at this point, he may want to.
I also agree with paper from the engineer, CYA.