dbravo:
IMHO, you should refer to 590.2 (b), check with the local AHJ regarding your proposed temp install.
Conforming with 230 part 1 thru 7 requirements, should not pose any issues, based on what you described above.
MOCP at the gen, feeder to your MDP and branch circuits feeding your loads.