MX, your argument makes no sense at all. You base your panel location on the size of the load? What the heck does that have do do with a major failure. Why would a lightly loaded panel be ok in one bdedroom but not a master bedroom. Thank god most guys don't bother submitting code chnge proposals because there are some real oddball ideas out there. I can see it now. All residential loadcenters shall be installed in a NASA approved explosionproof vault. [Linked Image] The good news is we work from the NEC and therfore I can put as many panels in bedrooms as i would like.