First I would attempt to install the panel interior, the outdoor enclosure has to be more expensive.

Second I assume you are routing the cables to the circuits once your in the building, rather than terminate the two sleeves at the old panel inside.

Third I would look at 312.5 (c) but that permissive language only applies to cables at the top of the panel

[This message has been edited by cpal (edited 07-27-2004).]