hi,
i was interested to know what your interpretation is on article 230.50?
does this mean that you can NOT use a SE Cable without a main at the meterbase unless the cable is protected by a raceway?
does SE Cable need a raceway if the MAIN is located inside the building?
thanks for any replies?
-regards
frodo
[This message has been edited by frodo (edited 04-17-2002).]