Here's a tangent to this...
We recieved a delivery of electric ranges...the order stipulated that the ranges have the cords attached...the ranges have a 4-wire cord attached...the range itself has a the jumper still installed between N-G.
These ranges are being installed in new construction.
Who would say is responsible for checking that connection?
- The Appliance Co. where they were ordered from
- The GC that ordered them
- The EC that installs them
- Check the contract
[This message has been edited by Celtic (edited 09-19-2006).]