When I was in business and I was bidding on a job, I would but in 2 bids. The first bid was as per the print. Then I would add all the extra receptacles, or outlets that were needed to make the job pass inspection. For example, recpt. in the attic within 25 of HVAC unit, etc. Also most of the time I was bidding on these jobs it was mostly residential work and the codes are more cut and dry.