1)Ammended...I just did a 200A mobile home (double wide) service. Overhead 10' GRC mast, 50' of 2" PVC to panel. 60' of Tri-rated cable. 45' of Tri-rated single conductor, 2 g-rods (bent [Linked Image] )
2 LB's and a 90, hung with Min-E's on caddy beam clamps...

No SE Cable... All Pipe...

Cost less inspection, $599.

Customer supplied the Feed-Through Disco (read-used).
Had to use several plugs for it though...


[This message has been edited by sparky66wv (edited 07-11-2001).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI