ElectricJ:

Your relative probably means "gunite"; not "graphite".

First off, get a copy of the NEC that is in effect in your area, and go to Article 680.

Next, are permits required in your area???

Bonding is pretty straightforward, any metal over 4 sq inches, within 5' of the pool must be bonded. #8 SOLID copper, bare or green.

Basically the wiring:
PVC, a conductor with a "W" (THHN/THWN)

Read Art 680, it's not that tough.
If the FO lighting has a metal shell, it has to be bonded, it may be a plastic shell.

Have you tried "speaking" to your AHJ??? All of them (us) are not bad guys.
John


John