I am seeing a lot more outside disconnects these days. That may become the industry standard some day. Right now the only general requirement for one is on a piling house where the main panel is on the 2d floor and the meter base is on the "open" grade level. They know that area under the house will be enclosed making that "outside" SE cable "inside".


Greg Fretwell