Harold:
DCA did Plan Review, I processed and approved the permit, as did Building Subcode for the ground mounting.

I'm doing the inspections, and DCA will follow-up?

Yes, per the last directive that I saw, this is considered a generation plant, as none of the power will be utilized at the site. It's going directly into the grid at primary voltage.

As of today, with the great weather break weve been having, the project is 1-1/2 weeks ahead of schedule.



John