ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,674 Are you busy
169,392 Re: Forum
162,711 Need opinion
Who's Online Now
1 registered members (ampherder), 43 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#9775 - 05/12/02 10:21 PM Estimate for labor  
Jim M  Offline
Member
Joined: Aug 2001
Posts: 457
Chestertown, MD, USA
I just looked at a job at an Army base. They are rehabbing 2900 units. The work involves removal of the old switches, receptacles and replacing them with new and adding GFI's where needed. The ceiling fixtures will also be replaced. All matls are supplied by the base. Cleanup is not part of the work either, just strip, replace and move on.

Any thoughts on a per opening price? The work may get split between contractors. The pay is supposed to be at 30 days.

Any caveats? I already warned them about the possible problem with the luminaires and the old wiring regarding temperature constraints.

This is in MD.

TIA
TIA


Work Gear for Electricians and the Trades

#9776 - 05/13/02 08:04 PM Re: Estimate for labor  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,306
are the units similar? perhaps a 'per unit' $$$ ?

oh and, about the fixtures & old wiring, there is to my understanding no 'approved' method ( all pie in da sky aside..) so i just pigtail a few inches of 90deg rx bettween the old wiring & new fixture....


#9777 - 05/13/02 10:14 PM Re: Estimate for labor  
Jim M  Offline
Member
Joined: Aug 2001
Posts: 457
Chestertown, MD, USA
All the units are supposed to be similar. 2 bed, 1 1/2 bath living and kitchen.

My thought is about 12 minutes per device to remove and re-install x no. of devices. Should I bump this up?


#9778 - 05/13/02 10:28 PM Re: Estimate for labor  
Electric Eagle  Offline
Member
Joined: Apr 2002
Posts: 914
Alpharetta, GA
If you base it on 12 minutes per device(switch/receptacle) you should be very safe. We do it in about half that time as long as the wire is in decent shape and post 1960ish and not aluminum or copper clad. Of coarse fixtures or "luminaires" as we now call them, take a little longer.


#9779 - 05/13/02 10:28 PM Re: Estimate for labor  
aldav53  Offline
Member
Joined: Aug 2001
Posts: 545
Chandler, AZ USA
You could just charge an hourly rate.


The Golden Rule - "The man with the gold makes the rule"

#9780 - 05/16/02 02:10 AM Re: Estimate for labor  
hurk27  Offline
Member
Joined: May 2002
Posts: 68
Portage, Indiana
your per opening is not bad but always put in your bid that you are not responsible for any unforeseen wiring that might have to be repaired to make the installs safe or devices that they supply. always protect your self the goverment can be very sticky about any up charges

[This message has been edited by hurk27 (edited 05-16-2002).]


Be Fair, Be Safe
Just don't be Fairly Safe


Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.002s) Memory: 0.7752 MB (Peak: 0.9177 MB) Zlib enabled. Server Time: 2017-04-25 10:37:25 UTC