ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,685 Are you busy
169,413 Re: Forum
162,733 Need opinion
Who's Online Now
0 registered members (), 86 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#92960 - 04/20/05 06:29 PM Temporary Installation?  
jes  Offline
Member
Joined: Jul 2002
Posts: 103
CT
Do remediation services that come in after a water leak or similar problem with cleaning, drying and dehumidifier equipment fall under the requirements of 527.6 (2002 ed) for GFCI protection?? Usually there are numerous pieces of equipment and some cords. Much of this equipment could be considered janitorial...


2017 / 2014 NEC & Related Books and Study Guides

#92961 - 04/21/05 12:54 PM Re: Temporary Installation?  
DougW  Offline
Member
Joined: Jun 2003
Posts: 1,143
North Chicago, IL
It might depend on how their equipment is wired. I would think that appliances meant to be used in a wet environment would be "double" insulated... not sure how their (temporary) use would be covered in a Code interpretation.

ETA - maybe using GFCI cords / outlet adapters?

[This message has been edited by DougW (edited 04-21-2005).]


#92962 - 04/21/05 07:14 PM Re: Temporary Installation?  
jes  Offline
Member
Joined: Jul 2002
Posts: 103
CT
The appliances are provided with three wire cords (with equipment grounding conductor) with no integral GFCI. I guess what I am asking is whether this work would be considered 'construction, remodeling, maintenance, repair or demolition of buildings, structures, equipment or similar activities.' GFCI protection can be provided by a number of methods.


#92963 - 04/25/05 12:22 PM Re: Temporary Installation?  
safetygem  Offline
Member
Joined: Jan 2002
Posts: 119
Ohio, USA
Construction means, "work for construction, alteration, and/or repair, including painting and decorating." 29 CFR 1926.32(g)

Without actually seeing the work that is being performed, I'd say that this is more than likely within the scope of "construction."

Take a look at the following letter of interpretation from OSHA, particularly question and answer #1. While it does not specifically address your question, it does discuss some of the criteria used to differentiate between "construction" and "maintenance."

Hope this helps.

Edited to add link to letter of interp. (oops.) http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=247 89

[This message has been edited by safetygem (edited 04-25-2005).]



Member Spotlight
Niko
Niko
Campbell, CA
Posts: 356
Joined: August 2006
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.003s) Memory: 0.7598 MB (Peak: 0.8924 MB) Zlib enabled. Server Time: 2017-04-25 18:23:51 UTC