ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,316 Are you busy
174,782 Re: Forum
167,152 Need opinion
Who's Online Now
0 registered members (), 68 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#92949 - 04/18/05 11:18 PM Wiring Manner in Russia  
Itoh  Offline
Junior Member
Joined: Apr 2005
Posts: 4
Yokohama, Japan
We are working for Russian construction project. According to our Russian partner, wiring methos for 24V DC instrument such as transmitter, solenoid valve, gas detectors, etc. shall be 3-wire system (+/- and earthing). As far as I know, the 3-wire method is very old Russian practice and it is not valid any more. Therefore we understand that europian style 2-wire system (+/- only) is sufficient for 24V DC instrument wiring. Also as far as we checked, we have never found out such code&standard requirement of "3-wire".


2017 / 2014 NEC & Related Books and Study Guides

#92950 - 04/19/05 10:52 AM Re: Wiring Manner in Russia  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA



Member Spotlight
Trumpy
Trumpy
SI,New Zealand
Posts: 8,217
Joined: July 2002
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.015s Queries: 14 (0.003s) Memory: 0.7437 MB (Peak: 0.8611 MB) Zlib enabled. Server Time: 2017-07-25 02:50:24 UTC