ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 8 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
trenches for raceways. #92225
03/08/05 02:56 PM
03/08/05 02:56 PM
M
m_marquez  Offline OP
Junior Member
Joined: Mar 2005
Posts: 2
Mission TX
based on the nec is it permited to run any other line in same trench for race way. example; water line or telecominication wires.


marquez
2017 / 2014 NEC & Related Books and Study Guides
Re: trenches for raceways. #92226
03/08/05 03:26 PM
03/08/05 03:26 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,166
Estero,Fl,usa
The NEC is silent on the issue


Greg Fretwell
Re: trenches for raceways. #92227
03/09/05 02:29 PM
03/09/05 02:29 PM
E
eesac  Offline
New Member
Joined: Feb 2005
Posts: 8
california
Since NEC doesn't "disallow" it, it shouldn't be a problem. We use this common trench set-up often with primary power, secondary power, communications, tv, and gas line all in the same common trench. We use a similar common trench detail that are usually in utility company infrastructure installation manuals, there is usually about a 12" separation between systems. As far as water line, there shouldn't be a problem. Metallic water lines are ground bonded in buildings, and all electric lines underground get wet. Unless the water company or civil engineer in their codes have an issue.

Re: trenches for raceways. #92228
03/09/05 03:46 PM
03/09/05 03:46 PM
S
safetygem  Offline
Member
Joined: Jan 2002
Posts: 119
Ohio, USA
I'd have to agree that the NEC is silent on this issue.

However, from a practical standpoint. I could see a potential safety issue down the road in the case of a water line break.

If the water line breaks or is damaged, that means digging down, through the trench and potentially damaging the other utilities in the process.

I would think that if possible, you would want to separate the installations at least in a way that provides protection for the electric and if present the gas line.

Just something to think about.

Re: trenches for raceways. #92229
03/09/05 04:34 PM
03/09/05 04:34 PM
M
m_marquez  Offline OP
Junior Member
Joined: Mar 2005
Posts: 2
Mission TX
thanks for your response i could not find anything in the NEC thats why i asked but i think it would be up to an individual opinion. and a safety point of view.


marquez
Re: trenches for raceways. #92230
03/14/05 08:56 PM
03/14/05 08:56 PM
H
harold endean  Offline
Member
Joined: Feb 2002
Posts: 2,233
Boonton, NJ
If the wiring is before the outside meter, the utility companies should have the say on those trenches. Usually here in NJ the electric/cable and Telco can all go in one trench. Sewer and water in another trench and gas is usually seperate. If the trench in question is on private property and after the utility meter, the all is fair game in the same trench.

Re: trenches for raceways. #92231
03/14/05 09:13 PM
03/14/05 09:13 PM
G
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
There's only one safety net, let's say, thay gives us some protection. If the Service Conductors are direct burial, they need a warning ribbon 12" above the conductors. I don't have a copy of the NESC but if the NEC is applicable it would be Article 300 section 300.5(D)(3). I suspect the wording is similar in the NESC.


George Little
Re: trenches for raceways. #92232
03/14/05 10:29 PM
03/14/05 10:29 PM
C
Celtic  Offline
Member
Joined: Feb 2005
Posts: 361
NJ
It would be permitted - NEC code wise - to have tel. co and power in same trench...maintaining a 6" clearance(? Article #, anyone..or just a "rule of thumb"?)...BUT water and gas lines usually go DEEPER according to their respective codes and standards. Water is generally below the frost line...don't know about gas.
When in doubt, ask the AHJ.


~~ CELTIC ~~
...-= NJ =-...
Re: trenches for raceways. #92233
03/15/05 02:28 AM
03/15/05 02:28 AM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Don't think NEC has anything on it, but local codes may, and of course the utilities themselves may have some say it too. Heres one for PG&E joint trenching.
http://www.pge.com/docs/pdfs/custom...ice_requirements/joint_trench_config.pdf

(See #9 on page 3, I have no idea what that code is?)


Mark Heller
"Well - I oughta....." -Jackie Gleason

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
MarkC10
MarkC10
CA, Inland Empire
Posts: 43
Joined: September 2013
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 16
Potseal 15
Popular Topics(Views)
243,572 Are you busy
180,369 Re: Forum
170,846 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.017s Queries: 14 (0.003s) Memory: 1.0002 MB (Peak: 1.1679 MB) Zlib enabled. Server Time: 2018-01-21 02:32:37 UTC