ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Photocell
by Docholiday. 01/22/18 10:52 AM
AreMetal Ladders Ever OK For Electrical Work?
by gfretwell. 01/22/18 01:15 AM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (brsele), 29 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
circuit for Tuff Shed #90344
11/16/04 11:21 AM
11/16/04 11:21 AM
R
royta  Offline OP
Member
Joined: Sep 2004
Posts: 138
CA
A homeowner would like me to install a fluorescent light fixture and a couple 120V receptacles in his new wooden Tuff Shed. He already has an existing Tuff Shed, which somebody previously installed a couple receps into, and he (homeowner) would like me to get the power for the second shed from the first shed.

There is at least one violation with the first shed, which is easily resolved; there is no disconnect at the shed. However, there is a second situation which I don't know is okay or not. Power to the first shed is obtained from an outside recep on the house. A weather proof extension box was installed, and PVC conduit run to the first shed. Does the first shed need it's own circuit from the panel, or is it okay to share another circuit from the house? If it needs it's own circuit, can the second shed use the same circuit as the first shed, or does each shed need their own circuit from the main panel?

I apologize if this seems simple to others, but I've actually never ran power to a remote building, where I didn't install a sub panel. I do however know that I will not need grounding electrodes at each shed, as per the Exception to 250.32(A).

[This message has been edited by royta (edited 11-16-2004).]

2017 / 2014 NEC & Related Books and Study Guides
Re: circuit for Tuff Shed #90345
11/16/04 01:01 PM
11/16/04 01:01 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
I don't see anything that prevents building 3 from being fed from building 2.


Greg Fretwell
Re: circuit for Tuff Shed #90346
11/16/04 01:29 PM
11/16/04 01:29 PM
R
royta  Offline OP
Member
Joined: Sep 2004
Posts: 138
CA
What about how building 2 (first shed) was fed in the first place?

Re: circuit for Tuff Shed #90347
11/16/04 05:21 PM
11/16/04 05:21 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
I don't know why you couldn't feed a shed from the outside receptacle, assuming that was legal (proper wiring, depth, GFCI and not off the bathroom).
At a certain point we may have some design issues but I don't see the code problem yet.


Greg Fretwell
Re: circuit for Tuff Shed #90348
11/16/04 05:30 PM
11/16/04 05:30 PM
R
royta  Offline OP
Member
Joined: Sep 2004
Posts: 138
CA
You are correct with the design issues. I'm looking forward to moving away from residential remodel work. Homeowner's only understand one thing, price. They don't care what it looks like as long as it's inexpensive. That doesn't do well for me, because I end up priding myself out of a job, or losing the job to a non-compliant bid. I might not know the code like I wish I did, but I will certainly find out what is right and wrong before starting an installation.

There actually is a code issue, but it will go away once I extend the circuit to the 2nd shed. The PVC conduit terminates into a handy box mounted on the outside of the shed. At least there is a weather proof cover on the handy box though. [Linked Image]


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
CDS
CDS
Nicholson Ga
Posts: 34
Joined: June 2006
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
Potseal 15
sparky 15
Popular Topics(Views)
243,595 Are you busy
180,393 Re: Forum
170,862 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.022s Queries: 14 (0.007s) Memory: 0.9672 MB (Peak: 1.1055 MB) Zlib enabled. Server Time: 2018-01-22 18:21:53 UTC