ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,362 Are you busy
174,822 Re: Forum
167,212 Need opinion
Who's Online Now
0 registered members (), 69 guests, and 3 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#90228 - 11/05/04 10:44 PM Permit when??  
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
I would be interested in knowing from this group the point when you would be expected to obtain an electrical permit and schedule an inspection. For example in Michigan repairs or work exceeding $100.00 would require a permit. Don't ask me to justify that one. State law.


George Little

2017 / 2014 NEC & Related Books and Study Guides

#90229 - 11/05/04 11:57 PM Re: Permit when??  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,099
Estero,Fl,usa
The reality is you need an inspection any time the AHJ thinks you need one and that is more driven by revenue than safety ... no matter what they say.
If you replace a $150 water heater the permits are $90 here. It's no wonder people cheat.


Greg Fretwell

#90230 - 11/06/04 11:18 AM Re: Permit when??  
trekkie76  Offline
Member
Joined: Jun 2004
Posts: 220
baileyville, maine, usa
I hate to say it, but here in Eastern Maine, I have only had to have a permit for service changes, and few local municipalities further south have required permits. Not saying it is a good thing, just the reality of my area.


#90231 - 11/07/04 12:47 AM Re: Permit when??  
Steve T  Offline
Member
Joined: Feb 2001
Posts: 306
Oak Park, IL, USA
A permit is required for anything except changing a light bulb. If you think it's about revenue, you need to look at the cost analysis for that particular municipality. The $50 we charge to replace 25 receptacles does not cover the cost in servicing that permit. That can be proven. I'll bet 80% of inspections involving receptacles always turn up at least one that is improperly wired. If it can be done wrong, in my opinion it should require a permit.


#90232 - 11/07/04 11:08 AM Re: Permit when??  
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
Quote
If it can be done wrong, in my opinion it should require a permit.
Very well stated. The amount the contractor and ultimately the customer pays for a permit and inspection is the best insurance yet that the job has been done properly. It doesn't mean there won't be problems but at least there has been two people that say the job is correct. I don't know how it is in other States but in Michigan the Municipality is not allowed to make a profit on the permit/inspection process. The amount charged for the permit should cover the cost of administering the permit.


George Little

#90233 - 11/07/04 11:25 PM Re: Permit when??  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,099
Estero,Fl,usa
If permits were really about inspection the inspectors would not have to do 30-40 a day


Greg Fretwell

#90234 - 11/07/04 11:40 PM Re: Permit when??  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
Gfretwell wrote:
"If permits were really about inspection the inspectors would not have to do 30-40 a day"

Hell, and I thought 15-17 was a real tough day!!! How can 30-40 be inspected in a day??? 16 hour shifts???

BTW, here in NJ.....one permit fee covers any and all inspections for the work on the card. We do not have a re-inspection fee.

Permits are required for anything except "minor repairs". (replacment devices, light fixtures (same locations, no wiring)

Building dept. is supported by Permit fees; pays all costs for permits/processing/inspections.

John


John

#90235 - 11/09/04 11:41 AM Re: Permit when??  
Steve T  Offline
Member
Joined: Feb 2001
Posts: 306
Oak Park, IL, USA
Hotline1,

I'll bet improperly wired devices is one of my top items on an inspection report. I'd rethink what a minor repair is.


#90236 - 11/09/04 12:59 PM Re: Permit when??  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,099
Estero,Fl,usa
The number of inspections required is one of the things that keeps me from working as a muni inspector.
My wife is a builder and she works with these guys every day.
"FOURTY SEVEN" was the worst number I ever heard her say a guy had <plumbing inspector>. He was just dropping a yellow card in the box and driving on by the end of the day. Her structural guy had 41 the other day. (Lee County Fla)


Greg Fretwell

#90237 - 11/10/04 10:40 PM Re: Permit when??  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
Steve:
A good idea, but unfortunatley, the State DCA sets the rules, along with the Board of Examiners for Lic EC's.

Gfretwell:
I had to complain for Fri...19 on the printout.....heck 41 is insane for a 8 hr day! Are they 'drive-by's"

John


John

Page 1 of 2 1 2

Member Spotlight
RH1
RH1
California
Posts: 22
Joined: August 2009
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.8187 MB (Peak: 0.9951 MB) Zlib enabled. Server Time: 2017-07-27 18:52:31 UTC