ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,182 Are you busy
174,577 Re: Forum
167,015 Need opinion
Who's Online Now
1 registered members (gfretwell), 37 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#89533 - 09/25/04 07:19 PM Busway feeding entire building  
Active 1  Offline
Member
Joined: Feb 2003
Posts: 687
Grayslake IL, USA
I was at a small factory about 10,000 sf the other day and noticed something that did not look right to me.

There were 2 services because the bilding was devided in the past. Both 400 amp 3 phase. They each went into a 400 amp Disco and then straight to a bussway maybe 70' long. Off the 2 bussways fed the entire building. Maybe 6-8 panels in different locations 200 and 100 amp were run off the bussway. From those panels it must have fed the lighting, front office, HVAC, and general outlets. They also had the factory machines and a step up transformer off the same duct.

I looked in the NEC and could not find any violations with this. What's your opinion on this. Acceptibale or unaccepticable?

Tom


2017 / 2014 NEC & Related Books and Study Guides

#89534 - 09/25/04 08:12 PM Re: Busway feeding entire building  
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Regarding the bus duct, I can't think of anything wrong here. This is a very flexible means of distributing power, kind of expensive, but if the power requirements change on a regular basis, might end up being the least expensive way of doing things.


Few things are harder to put up with than the annoyance of a good example.

#89535 - 09/27/04 06:03 AM Re: Busway feeding entire building  
Nick  Offline
Member
Joined: Aug 2001
Posts: 599
Riverside, CA
This is a common way of feeding high rise office buildings. Come out of the service gear with 4000A bus duct and run it vertical through the electric rooms. Each room has a place to set a couple of disconnects on the bus to feed the floor. From what you describe I see nothing wrong.


#89536 - 09/27/04 05:22 PM Re: Busway feeding entire building  
trekkie76  Offline
Member
Joined: Jun 2004
Posts: 220
baileyville, maine, usa
so, how much DOES a bus weigh? [Linked Image]


#89537 - 09/27/04 05:26 PM Re: Busway feeding entire building  
Happy Birthday iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
A lot when you are on the other end of the rope hauling them up the elevator shaft. [Linked Image]


Bob Badger
Construction & Maintenance Electrician
Massachusetts


Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 14 (0.004s) Memory: 0.7687 MB (Peak: 0.9066 MB) Zlib enabled. Server Time: 2017-07-21 18:41:44 UTC