ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 24 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
100 amp service #8825
04/05/02 10:34 AM
04/05/02 10:34 AM
E
eman1963  Offline OP
Member
Joined: Jan 2002
Posts: 22
rhode island
Hello hey what r u guys charging for a 100 amp service i charge $750.00 that includes seu about 20' service head meter trim 20 posi panel about 15 breakers ground rod and the rest of parts. hows my price? permit fee included in price


joe
rhode island here

Work Gear for Electricians and the Trades
Re: 100 amp service #8826
04/05/02 03:42 PM
04/05/02 03:42 PM
E
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
So you're the guy putting in the 20 circuit panels. It drives me CRAZY when I go to do a job where they "already had the service changed, it was such a mess of different boxes". Well guess what lady, I'm adding another box, because the last guy put in a 20 circuit panel and there is no space left. Murray has a 30 circuit 100 amp main breaker panel for about $60.00 at the depot. Oh too answer your question I would charge closer to $900 or more for this. (Massachusetts)

Re: 100 amp service #8827
04/07/02 05:22 PM
04/07/02 05:22 PM
F
Frank Cinker  Offline
Member
Joined: Jul 2001
Posts: 311
Pennsylvania
$850.00. Pennsylvania

Re: 100 amp service #8828
04/07/02 08:01 PM
04/07/02 08:01 PM
A
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
$750 per 100A underground (up to 400A)
$875 per 100A overhead (up to 400A)

Includes disco, service cable, breakers and at least 32 cir MB panel. No permit fees, no utility connection fees. Arc fault extra. GFI breakers extra. Georgia.

Re: 100 amp service #8829
04/09/02 09:35 AM
04/09/02 09:35 AM
E
eman1963  Offline OP
Member
Joined: Jan 2002
Posts: 22
rhode island
guys wouldnt a 30 posi panel be to much on 100 amp service people would just keep adding on ohhh!!!!! more spaces the home owner sais!!!!!

Re: 100 amp service #8830
04/09/02 09:36 AM
04/09/02 09:36 AM
E
eman1963  Offline OP
Member
Joined: Jan 2002
Posts: 22
rhode island
said!!!!

Re: 100 amp service #8831
04/09/02 11:48 AM
04/09/02 11:48 AM
C
CRW  Offline
Member
Joined: Feb 2001
Posts: 159
Bethlehem, PA USA
There's nothing wrong with lots of spaces/circuits as long as the total load isn't more than the MB can handle. All those circuits are not maxed at the same time. If you keep overloading the MB, then at that point I guess you realize it's time to upgrade the whole service.

Re: 100 amp service #8832
04/09/02 09:05 PM
04/09/02 09:05 PM
S
spkjpr  Offline
Member
Joined: Dec 2000
Posts: 218
Sedalia,MO, USA
I agree with CRW. Here we must use a min 150 A panelboard. I use 200A 42 space panels and yet have had one overload the Main. Seems just as easy to put in the larger as it is to have to go back and upgrade and deal with poco again. By the way price on upgrading to a 200 A service and reconnecting existing wiring is $700 on average for me.

[This message has been edited by spkjpr (edited 04-09-2002).]

Re: 100 amp service #8833
04/10/02 06:57 AM
04/10/02 06:57 AM
E
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
skpjr, that price is outrageously low. Materials alone for a 200 amp service run abou $300-$500 for me. I was doing 200 amp upgrades for about $1200 but now with the afci cost and the time it takes to identify all the bedroom circuits it'll run $1500 and up. By the way what kind of panel do you use, I have never seen one with 42 circuits.
Scott

Re: 100 amp service #8834
04/10/02 09:28 PM
04/10/02 09:28 PM
S
spkjpr  Offline
Member
Joined: Dec 2000
Posts: 218
Sedalia,MO, USA
Electricmanscott, I goofed. It is a 40 circuit panel, musta lost track when I had to take my shoes off to count them,lol. I use the Square D Homeline panel from the blue house (I know but the price and reliability are right)and I do not currently have to go the AFCI route yet. Our jurisdiction has not gone to the 2002 code, AHJ is kind of slow about upgrading and he is still iffy on when we will move up. I might also mention that I am still trying to get my business to the point I can do it full time, currently work midnight at a factory maint dept. Does seem my price is a little low but gotta go with what the market will bear. May need to re-evaulate pricing.

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
RH1
RH1
California
Posts: 22
Joined: August 2009
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 15
Potseal 15
Popular Topics(Views)
243,602 Are you busy
180,416 Re: Forum
170,873 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.019s Queries: 15 (0.004s) Memory: 1.0213 MB (Peak: 1.1965 MB) Zlib enabled. Server Time: 2018-01-23 21:51:36 UTC