ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
Question on power to 4 Nema 6-50 & 5 Nema 5-15.
by TrickedoutTech. 10/22/17 11:36 PM
VFD MotorFeeders
by Yoopersup. 10/22/17 07:52 PM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,460 Are you busy
177,455 Re: Forum
169,027 Need opinion
Who's Online Now
1 registered members (gfretwell), 44 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#85231 - 06/11/03 03:54 AM MCTs in Div 1 area  
Nagelec  Offline
Member
Joined: Jun 2003
Posts: 12
Sharjah, UAE
Could anyone please clarify that whether MCTs (multi cable transits) are allowed in Div.1 areas?


2017 / 2014 NEC & Related Books and Study Guides

#85232 - 06/11/03 09:23 AM Re: MCTs in Div 1 area  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
If you mean a Cable Tray System. A unit or assembly of units or sections and associated fittings forming a structural system used to securely fasten or support cables and raceways.

See the NEC Article 318 or 392 under Uses Permitted.

Cable trays in hazardous (classified) locations shall contain only the cable types permitted in 501.4, 502.4, 503.3, 504.20, and 505.15.


Joe Tedesco, NEC Consultant


Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,262
Joined: December 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 14 (0.003s) Memory: 0.7427 MB (Peak: 0.8613 MB) Zlib enabled. Server Time: 2017-10-23 17:21:42 UTC