ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 04/29/17 10:26 AM
201 volt equipment?
by bigpapa. 04/29/17 12:15 AM
Schneider LC1D09
by jraef. 04/28/17 11:05 PM
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,940 Are you busy
169,768 Re: Forum
162,977 Need opinion
Who's Online Now
1 registered members (Ruben Rocha), 81 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#84694 - 04/24/03 12:19 PM main disconnect  
GEO  Offline
Member
Joined: Mar 2003
Posts: 47
Lancaster,Pa
would a fire switch (disconnect before meter)
be wired as the main disconnect for the service? thanks GEO


2017 / 2014 NEC & Related Books and Study Guides

#84695 - 04/24/03 02:13 PM Re: main disconnect  
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
Geo,
The only problem is that 230.91 requires that the service OCPD be a part of or be located immediately adjacent to the disconnect.
Don


Don(resqcapt19)


Member Spotlight
Tom
Tom
Shinnston, WV USA
Posts: 1,044
Joined: January 2001
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.008s Queries: 14 (0.002s) Memory: 0.7424 MB (Peak: 0.8572 MB) Zlib enabled. Server Time: 2017-04-29 15:44:12 UTC