ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
VDE 0100 to introduce AFCIs
by sparky. 01/19/18 08:03 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 16 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
General wiring #83652
02/11/03 03:00 PM
02/11/03 03:00 PM
E
EVAD7  Offline OP
Member
Joined: Mar 2002
Posts: 37
MN
Does a system need to be extended throughout the entire building? for example, three phase 4w 240 Volt, Feeder just for 3 phase load, Do you carry the neutral even if it isn't used?

2017 / 2014 NEC & Related Books and Study Guides
Re: General wiring #83653
02/11/03 03:36 PM
02/11/03 03:36 PM
P
Pearlfish  Offline
Member
Joined: Sep 2002
Posts: 83
Chicago Ridge, Il, USA
It depends on how forward-thinking you want to be. You didn't give enough information for a better answer. It's cheaper to install a little extra now, than re-do the work later. What if you need to install some control circuits?

Re: General wiring #83654
02/11/03 03:44 PM
02/11/03 03:44 PM
E
EVAD7  Offline OP
Member
Joined: Mar 2002
Posts: 37
MN
This is a code question,is there any requirement to extend the system in each feeder?

Re: General wiring #83655
02/11/03 05:09 PM
02/11/03 05:09 PM
L
Len_B  Offline
Member
Joined: Jan 2003
Posts: 53
New Hampshire
There is no requirement to install a neutral in a feeder or branch circuit that does not utilize it.

Re: General wiring #83656
02/11/03 06:06 PM
02/11/03 06:06 PM
R
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
EVAD7,
What you're saying rings a bell, but I can't find it.

Re: General wiring #83657
02/11/03 07:29 PM
02/11/03 07:29 PM
R
Ron  Offline
Member
Joined: Mar 2002
Posts: 582
White Plains, NY
The neutral needs to be brought to the main disconnect if it is a 3 phase 4 wire service.


Ron

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 186
Joined: November 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 15
Potseal 15
Popular Topics(Views)
243,566 Are you busy
180,366 Re: Forum
170,844 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.021s Queries: 14 (0.006s) Memory: 0.9731 MB (Peak: 1.1190 MB) Zlib enabled. Server Time: 2018-01-20 21:02:55 UTC