ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (gfretwell), 12 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Class 1 Div 1 #82771
12/11/02 12:17 PM
12/11/02 12:17 PM
V
VOLTS  Offline OP
Member
Joined: Jun 2001
Posts: 21
Is it ok to have a unclassified area open into an class 1 div 1 that is seperated by a doorway? Should there be an transition area of div 2? 500.5 B (2)3 does not indicate how large the transition area sould be if required.

2017 / 2014 NEC & Related Books and Study Guides
Re: Class 1 Div 1 #82772
12/11/02 04:08 PM
12/11/02 04:08 PM
S
spyder  Offline
Member
Joined: Oct 2002
Posts: 210
Massachusetts
Engineers and building officials make the call on that stuff. Contact the AHJ and have them make the call.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
togol
togol
NW In. USA
Posts: 421
Joined: September 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 16
Potseal 15
Popular Topics(Views)
243,581 Are you busy
180,379 Re: Forum
170,855 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.015s Queries: 14 (0.003s) Memory: 0.9405 MB (Peak: 1.0585 MB) Zlib enabled. Server Time: 2018-01-21 18:14:08 UTC