ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
What do you do?
by gfretwell. 09/22/17 10:37 PM
Another generator question
by gfretwell. 09/21/17 02:41 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 09/15/17 11:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,883 Are you busy
176,640 Re: Forum
168,544 Need opinion
Who's Online Now
0 registered members (), 41 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#81397 - 08/08/02 03:16 PM Load center in Kitchen?  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
I'm being told that a sub-panel can't be located in a kitchen.
All clearances are OK.
I can't find a reason.
I looked at 230.70, & 240.24. & 408.
Anyone?


2017 / 2014 NEC & Related Books and Study Guides

#81398 - 08/08/02 03:22 PM Re: Load center in Kitchen?  
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
Redsy,
I can't see any code violation as long as you have the required working clearances. Did they give a reason?
Don


Don(resqcapt19)

#81399 - 08/08/02 03:53 PM Re: Load center in Kitchen?  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
Not allowed in closet, dwelling bathroom.

Kitchen restriction not found in my code. Inspector must cite a specific rule. Sure wish I could be there to hear where the rule is.


Joe Tedesco, NEC Consultant

#81400 - 08/09/02 07:52 AM Re: Load center in Kitchen?  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
I found out I am in the middle of a pi**ing contest between an insurance adjuster and a building management group.
There was a fire in a 6 unit apartment house, and the insurance company wants to re-use as much material as possible, including soot-covered electric baseboard heaters.
The property owners and myself insist on code upgrades.
As of yesterday I hadn't spoken to the inspector myself. But I have since done so, and he has no problem with the installation as submitted, and, as expected will require wiring to the current codes.
I guess second hand information is all but useless.

Thanks for the input.


#81401 - 09/17/02 11:32 PM Re: Load center in Kitchen?  
John Steinke  Offline
Member
Joined: Apr 2001
Posts: 518
Reno,Nv., USA
Considering all the circuits required for a kitchen, as well as the code's advice to allow for future growth, I think that a sub-panel for the kitchen is a wonderful idea!
Review: 2 appliance circuits; dishwasher/disposal circuit; refrigerator circuit; microwave circuit; 2 range circuits; lighting circuit. There goes an 8-space panel! (List of reasonable circuits- not required ones!)



Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician